Parks                                                  2008-2013                   Capital Improvements Program       Schedule for Six Year Period
    a = Special assessment Bonds                 ad = Abatement District                            c = County        eu = Electric Utility                                     f = Federal                                                           fr = Flood Control Reserves  
    fb = Food & Beverage Tax                            go = General Obligation Bonds              gs = Golf Surplus Park & Rec Fund      lt = Lodging Tax                                        ms = MN State Aid-Streets                               ot = Operating Transfer-General Fund  
    p = Private Funds                                           pc = Passenger Facility Charges            r = Project Reserves       rb = GO Revenue Bonds                        re = Retained Earnings                                    s = State  
    sa = Sn/Sewer Availability Chg                    sl = State Loan Fund                                st = Sales Tax         sw = Storm Water Mgmt Chg                  t = Tax Levy                                                        td = Traffic Improvement Dist Chg  
    ti = Tax Increments                                         to = Operating Trnsfrs-Other Fnds        wa = Water Availability Chg       wu = Water Utility  
Sort Map # Project Description Proj # Total Cost 2008 2009 2010 2011 2012 2013
0
1 1 Cascade Lake Park.  This project consists of consultant services and construction.  Initial landscaping of the north side of the lake in 2008 ($20,000), trail construction 2008-2009 on the north side of the lake ($750,000), beach area grading plan in 2008 ($20,000), shaping and grading  the Mayo cell penninsula and park area adjacent to control structure 2010,  parking facilities and continued landscaping in 2011 and beach area grading 2011. 2981            2,410,000               25,000  t               100,000  t              100,000  t              300,000  t              300,000  t              275,000  t 
1               850,000  fr                 50,000  fr                      150,000  fr 
1               260,000  r 
1  
2 2 Rochester Baseball Complex projects include irrigation ($30,000) and open shelter ($50,000)  in common area adjacent to concession building.   Partial funding by RYBA.  The private funds from 2008-2011 is RYBA's repayment of funds used to light fields in 2005. 2890                430,000               35,000  t                 40,000  t                 40,000  t                 45,000  t                 25,000  t                 25,000  t 
2                 35,000  p                 35,000  p                 35,000  p                 40,000  p                 75,000  p 
2  
3 3 Plummer House improvements.  This project consists of boiler and roof replacement, tuck pointing and replacement of water pipes.   2980                205,000               30,000  t                 20,000  t                 25,000  t                 30,000  t                 40,000  t                 50,000  t 
3                 10,000  r 
3  
4 4 Reforestation of city parks / public lands and boulevards in anticipation of significant tree losses due to Emerald Ash Borer. 3033                300,000               25,000  t                 35,000  t                 45,000  t                 55,000  t                 65,000  t                 75,000  t 
4  
5 5 Kutzky Tennis Center improvements include repairs to clubhouse and 15 courts, replace wind screen and nets and re-roof the building 2905                224,500               44,500  r                 25,000  t                 30,000  t                 35,000  t                 40,000  t                 50,000  t 
5  
6 6 Central Park Heritage House roof replacement 2933                  29,500               17,000  r                    2,500  t                   2,500  t                   2,500  t                   2,500  t                   2,500  t 
6  
7 7 Tennis Court improvements.  This project includes the repair and replacement of 17 pairs of tennis courts located throughout the city.     2944                210,000               30,000  r                 40,000  t                 20,000  t                 25,000  t                 40,000  t                 55,000  t 
7  
8 8 East Park improvements includes construction of permanent storage building and restroom facilities.   3027                207,000                  7,000  r                 15,000  t                 20,000  t                 35,000  t                 60,000  t                 70,000  t 
8  
9 9 Park acquisition and development.  To provide funding for acquisition and development of park lands not identified on the master acquisition plan.  2899                320,000               20,000  r                 10,000  t                 15,000  t                 20,000  t                 30,000  t                 45,000  t 
9                  40,000  r                 60,000  r                 80,000  r 
9  
10 10 Quarry Hill  Park  /  Quarry Hill Nature Center.  This projects includes phase II of replacing roofing (2011), and enclosing exterior stone chimney (2008), park and trail signage (2008) 2913                230,000               20,000  t                 45,000  t                 25,000  t                 30,000  t                 50,000  t                 50,000  t 
10                 10,000  r 
10  
11 11 Restoration of prairie involving vegetation management and establishment of prairie in city parks and on other city owned lands. 3003                  70,000                  5,000  r                 10,000  t                 10,000  t                 15,000  t                 15,000  t                 15,000  t 
11  
12 12 Kutzky Park improvements include replacement of shelter (2009-$165,000) and  irrigation of football field (2008-$20,000). 3031                220,000               20,000  r                 25,000  t                 30,000  t                 45,000  t                 50,000  t                 50,000  t 
12          
13 13 Ridge View Manor Park.  This project includes general site work and landscaping and  trail from 65 St and to Douglas Trail .  Transfer $25,000 from NW2898 dedication funds.     2874                216,000               51,000  r                 10,000  t                 20,000  t                 30,000  t                 40,000  t                 65,000  t 
13  
14 14 SE Youth Softball Complex consists of the development of a 5 field complex at the intersection of TH 14 and 36 Ave SE.  Private funds from Youth Softball Association to repay City for 2007 construction of fields.  Transfer $5,000 from the F E Williams Fund. 3025                315,000               61,000  t                 25,000  t                 25,000  t                 25,000  t                 25,000  t 
14                 25,000  p                 25,000  p                 25,000  p                 25,000  p                 49,000  p 
14                    5,000  to 
14  
15 15 Park/Forestry operations center improvements.  This project consists of replacement of floor surfaces in leased spaces, adding restrooms and crew rooms, and an equipment wash bay. 2928                152,000               52,000  t                 25,000  t                 25,000  t                 25,000  t                 25,000  t 
15  
15  
16 16 Silver Lake Park improvements include continued remodeling of West Silver Lake shelter,  irrigating baseball field ($20,000), and replacing the playground on the east side of the park  ($50,000). 3012                110,000               40,000  r                 20,000  t                 25,000  t                 25,000  t 
16  
17 17 Essex Park projects include repairs to caretaker's quarters in 2008 ($5,000), construction of a storage building and development of site for staging park operations on the north side of the City and conversion of 30 acres to native grasses / prairie. 2950                442,000               52,000  r                 70,000  t              100,000  t              100,000  t              120,000  t 
17  
18 18 McQuillan Field improvements includes continued replacement of field fencing in 2008 ($25,000) and the planning and development of 40 acres south of existing fields 2962                230,000               25,000  t                 40,000  t                 45,000  t                 50,000  t                 60,000  t 
18                 10,000  r 
18  
19 19 Development and improvement of park drives and parking lots.   2909                287,000             137,000  r                                 50,000  t                 50,000  t                 50,000  t 
19  
20 20 Mayo Field improvements.  The project consists of repainting the grandstand,  relighting the field, and replacing spectator fencing. 2914                230,000               30,000  t                 25,000  t                 30,000  t                 50,000  t                 35,000  t 
20                 60,000  r 
20  
21 21 Soldier's Field Park improvements.  This project includes the addition of a canopy shelter south of new restroom (2010), upgrade of softball field fencing (2008), and football field lighting (2011). 2878                225,000               25,000  t                 35,000  t                 40,000  t                 70,000  t                 55,000  t 
21  
22 22 Eastwood Park / 100 Acre Woods site development and equipment. 3020                110,000               20,000  r                 30,000  t                 30,000  t                 30,000  t 
22  
23 23 Weatherstone Park development.  This project consists of site work and trails,  including a connection to the Douglas Trail.    2883                134,000               59,000  r                     35,000  t                 40,000  t 
23  
24 24 Fox Trail Park and related neighborhood park development on KR reservoir, including trails, playground equipment, and landscaping. 3018                  75,000               25,000  r                 25,000  t                 25,000  t 
24  
25 25 Pinewood Ridge Park development.  This project consists of site work, landscaping, trails, and playground equipment. 3021                110,000               45,000  t                 10,000  t                 10,000  t 
25                 45,000  r 
25  
26 26 Pinewood Hills Park development.  This project consists of grading, field construction, and playground equipment. 3019                  90,000               60,000  r                 15,000  t                 15,000  t 
26  
27 27 Hart Farms Park development.  This project consists of access paths, sidewalk installation, landscaping and sports field construction.  Transfer reserves of $30,000 from SW 2897 dedication funds.   3005                  61,000               36,000  r                 10,000  t                 15,000  t 
27  
28 28 Scenic Oaks Park development.  Includes access paths, sidewalks and field construction.   Transfer reserves of $25,000 from SW  2897 dedication funds. 3006                  84,000               54,000  r                 15,000  t                 15,000  t 
28  
29 29 Summit Pointe Park development access paths and landscaping    2881                  28,500               13,500  r                 15,000  t 
29  
30 30 Fencing / Backstop replacements at Lutheran School and Zumbro Park South. 2888                  28,000               13,000  r                 15,000  t 
30  
31 31 Adventure Playground in Silver Lake Park includes replacement of playground surfacing. 2988                115,000               65,000  t                 25,000  t 
31                 25,000  r 
31  
32 32 Fieldstone Park development.   This project consists of play field, landscaping, and playground equipment.   3030                  75,000               25,000  r                 50,000  t 
32  
33 33 Foster Arend Park project includes replacement of playground equipment on the beach. 2958                  14,500               14,500  r         
33  
34 34 Northern Slopes Park playground replacement 3010                  35,000               35,000  r 
34  
35 35 Schmidt Park improvements consists of the development of the school/park site as an interim neighborhood park.   2990                242,000                   7,000  r                 40,000  t                 50,000  t                 50,000  t                 95,000  t 
35  
36 36 West Diamond Ridge Park development.  Includes grading, seeding, playground equipment, ball diamonds, and parking lot.   3002                162,000                27,000  r                 20,000  t                 30,000  t                 40,000  t                 45,000  t 
36  
37 37 Harvest View Park development.   This project consists of site work, playground equipment, and site furniture.  This park to be developed jointly with the adjacent elementary school site.                200,000                50,000  t                 50,000  t                 50,000  t                 50,000  t 
37  
38 38 Stonehedge Estates Park development.  This project consists of trails and the development of a neighborhood park in the subdivision.    3007                  62,700                12,700  r                 15,000  t                 15,000  t                 20,000  t 
38  
39 39 Development of Lincolnshire Park.  The development of 23 acres of athletic fields, ice rink, warming house and  trail connecting the park to Douglas Trail.  Concrete rink pad in 2008, year round boards and lighting followed by warming house in 2010. 2959                250,000              250,000  r 
39  
40 40 Badger Hills Park development.  This project consists of the development of a six acre site with a playfield and playground equipment.   Transfer reserves of $50,000 from NW 2898 dedication funds. 3028                103,000              103,000  r 
40  
41 41 Meadow Park replacement of playground equipment. 3011                  50,000                        50,000  t 
41                        
42 42 Silver Lake Pool improvements.  This project consists of recoating pool walls, reroofing, a new filtration system, and repairs to the facility. 2904                100,000                25,000  t                 25,000  t                 25,000  t                 25,000  t 
42  
43 43 Century Hills South Park development includes playground equipment and landscaping.                100,000                25,000  t                 25,000  t                 25,000  t                 25,000  t 
43  
44 44 Roy Watson Youth Sports Complex development.  This project includes paths and hard surfacing ball diamond plaza area. 2972                291,000                80,000  t                 30,000  t                 50,000  t              100,000  t 
44                  31,000  r 
44  
45 45 Morris Hills Park development.  This project consists of site development to start in 2008 and equipment in 2009.     3017                210,000                40,000  t                 40,000  t                 40,000  t                 45,000  t 
45                  45,000  r 
45  
46 46 Prairie Crossing Woodland Park development.  Includes trails and site work.                  75,000                25,000  t                 25,000  t                 25,000  t 
46  
47 47 Faud Monsour Youth Athletic Field Complex development includes construction of the parking area south of Heinz center, relocating two fields and irrigation and pond. 2951                125,000                30,000  t                 40,000  t                 55,000  t 
47  
48 48 Bamber Valley Estates Park development.  This project consists of site work, landscaping, and playground equipment.                  80,000                20,000  t                 30,000  t                 30,000  t 
48  
49 49 Bamber Ridge Park replacement of playground equipment.                  55,000                15,000  t                 20,000  t                 20,000  t 
49                                
50 50 Elmcroft Park projects include playground and backstop replacement. 3016                  50,000                50,000  t 
50  
51 51 Crimson Ridge corridor trail development from 55 Street to 65 Street NW.                  75,000                25,000  t                 25,000  t                 25,000  t 
51  
52 52 Soldier's Field pool shade canopy and other improvements. 2956                  80,000                20,000  t                 30,000  t                 30,000  t 
52  
53 53 Forest Knoll Park development.  This project consists of the development of a seven acre site with a playfield, trail access, and playground equipment.                175,000                50,000  t                 50,000  t                 75,000  t 
53  
54 54 Northern Heights Village Park development.  This project consists of grading and playground equipment on a four acre site.                120,000                40,000  t                 40,000  t                 40,000  t 
54  
55 55 Stone Gate Summit Park development includes playground and site work.                120,000 <