| Major Streets
2008-2013
Capital Improvements Program |
Schedule for Six
Year Period |
|
|
|
|
|
| |
|
a = Special assessment
Bonds ad = Abatement
District c =
County |
|
eu = Electric Utility f =
Federal
fr = Flood Control Reserves |
|
| |
|
fb = Food & Beverage
Tax go =
General Obligation Bonds
gs = Golf Surplus Park & Rec Fund |
lt = Lodging Tax ms =
MN State Aid-Streets ot = Operating
Transfer-General Fund |
|
| |
|
p = Private Funds pc
= Passenger Facility Charges
r = Project Reserves |
rb = GO Revenue Bonds re = Retained
Earnings
s = State |
|
| |
|
sa = Sn/Sewer
Availability Chg sl
= State Loan Fund st = Sales
Tax |
|
sw = Storm Water Mgmt Chg t = Tax Levy
td = Traffic Improvement Dist Chg |
|
| |
|
ti = Tax Increments to =
Operating Trnsfrs-Other Fnds wa
= Water Availability Chg |
wu = Water Utility |
|
|
|
|
|
|
|
| Sort |
Map # |
Project Description |
Proj # |
Total Cost |
2008 |
|
2009 |
|
2010 |
|
2011 |
|
2012 |
|
2013 |
|
| 0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
1 |
Rehabilitation of bituminous
streets with a pavement condition index of 0-59. |
2200 |
14,200,000 |
1,000,000 |
r |
1,100,000 |
r |
600,000 |
t |
600,000 |
t |
650,000 |
t |
650,000 |
t |
|
|
|
|
|
1,000,000 |
a |
1,100,000 |
a |
600,000 |
r |
600,000 |
r |
650,000 |
r |
650,000 |
r |
| 1 |
|
|
|
|
|
1,200,000 |
a |
1,200,000 |
a |
1,300,000 |
a |
1,300,000 |
a |
| 1 |
|
|
|
|
|
| 2 |
2 |
Street resurfacing/preservation
of streets with pavement condition index of 60-100. |
2201 |
12,000,000 |
1,000,000 |
r |
1,000,000 |
r |
1,000,000 |
r |
1,000,000 |
r |
1,000,000 |
r |
1,000,000 |
r |
| 2 |
|
|
|
|
1,000,000 |
a |
1,000,000 |
a |
1,000,000 |
a |
1,000,000 |
a |
1,000,000 |
a |
1,000,000 |
a |
| 2 |
|
|
|
|
|
| 3 |
3 |
Bridge repairs and painting by
contract at various locations |
7901 |
550,000 |
100,000 |
r |
150,000 |
r |
|
|
150,000 |
t |
|
150,000 |
t |
| 3 |
|
|
|
|
|
| 4 |
4 |
Reimbursement fund for TH 52
sales tax funds used to finance 50th Av NW project/Phase 1. |
9883 |
1,049,168 |
250,000 |
t |
250,000 |
t |
250,000 |
t |
250,000 |
t |
49,168 |
t |
|
| 4 |
|
|
|
|
|
| 5 |
5 |
City's share of a $2,200,000
County project to reconstruct CSAH 22/25 from CSAH #8 to TH14/TH52. |
7255 |
250,000 |
25,000 |
ms |
225,000 |
ms |
|
| 5 |
|
|
|
|
|
| 5 |
|
|
|
|
|
| 6 |
6 |
Construct 20 St SE from CR #1 to
CR #36. Sales Tax project. (includes
drainageway improvements from CR36 to Bear Cr). ROW costs included. |
2208 |
7,140,000 |
450,000 |
st |
2,420,000 |
f |
|
|
|
| 6 |
|
|
|
|
|
4,270,000 |
st |
|
|
|
| 6 |
|
|
|
|
|
| 7 |
7 |
Reconstruct 11 Av NW from 6th
Street to 10th St NW and Rehabilition of 11th Ave from 10th St NW to 14th St
NW. |
7746 |
2,500,000 |
730,000 |
f |
|
| 7 |
|
|
|
|
150,000 |
a |
|
| 7 |
|
|
|
|
16,000 |
wu |
|
| 7 |
|
|
|
|
1,604,000 |
ms |
|
| 7 |
|
|
|
|
|
| 8 |
8 |
Reconstruction of Center Street
from 1st Av West to Zumbro Bridge. |
7742 |
2,000,000 |
750,000 |
f |
|
| 8 |
|
|
|
|
750,000 |
a |
|
| 8 |
|
|
|
|
500,000 |
ms |
|
| 8 |
|
|
|
|
|
| 9 |
9 |
Correct geometric deficiencies
on 28 St SW (Bamberwood Area). |
7263 |
500,000 |
400,000 |
p |
|
|
|
| 9 |
|
|
|
|
100,000 |
t |
|
|
|
| 9 |
|
|
|
|
|
| 10 |
10 |
Widening of CSAH #2 (Viola Rd
NE) from Century Hills Dr to 36 Avenue NE |
7244 |
200,000 |
200,000 |
ms |
|
| 10 |
|
|
|
|
|
| 11 |
11 |
City's share of a $1,400,000
County project to widen Valleyhigh Dr (CR #4) from 31st Ave to 50th Ave
NW. Funding due from the Celestica TIF
District #16. |
9858 |
500,000 |
|
500,000 |
ti |
|
| 11 |
|
|
|
|
|
|
|
|
| 12 |
12 |
Concrete pavement rehabilitation
on State Aid Routes |
|
1,500,000 |
|
|
500,000 |
ms |
|
|
500,000 |
ms |
|
500,000 |
ms |
| 12 |
|
|
|
|
|
| 13 |
13 |
Multi-phased improvements
to: 55 St NW at West Circle Dr; 55th
St at Fairway Drive NW; and Members Parkway. |
9856 |
6,925,000 |
|
2,925,000 |
ms |
|
|
|
4,000,000 |
ms |
| 13 |
|
|
|
|
|
| 14 |
14 |
Reconstruct 2 St SW from 2 Av SW
to 6 Av SW with concrete pavement. |
7214 |
2,100,000 |
|
100,000 |
ms |
750,000 |
f |
|
| 14 |
|
|
|
|
|
750,000 |
a |
|
| 14 |
|
|
|
|
|
500,000 |
ms |
|
| 14 |
|
|
|
|
|
| 15 |
15 |
TH14 East Access Management
Improvements near 40th Avenue SE |
7249 |
250,000 |
|
250,000 |
t |
|
| 15 |
|
|
|
|
|
|
|
|
| 15 |
|
|
|
|
|
| 16 |
16 |
Rehabilitate West River Parkway
from Elton Hills Drive to 37 St NW. |
7208 |
700,000 |
|
340,000 |
f |
|
| 16 |
|
|
|
|
|
360,000 |
ms |
|
| 16 |
|
|
|
|
|
| 17 |
17 |
Rehabilitate 25th St SW from
Broadway to Oakridge Dr SW. |
7750 |
500,000 |
|
250,000 |
ms |
|
| 17 |
|
|
|
|
|
250,000 |
a |
|
| 17 |
|
|
|
|
|
| 18 |
18 |
Reconstruct 6th Street SW from
Broadway to 4th Avenue SW. |
7732 |
1,500,000 |
|
350,000 |
t |
|
| 18 |
|
|
|
|
|
350,000 |
a |
|
| 18 |
|
|
|
|
|
800,000 |
ms |
|
| 18 |
|
|
|
|
|
| 19 |
19 |
Improve TH 52 East Frontage Rd
north of 41 St and the intersection at TH52 East Frontage Rd and 41 St NW. |
9563 |
300,000 |
|
250,000 |
ms |
|
| 19 |
|
|
|
|
|
50,000 |
a |
|
| 19 |
|
|
|
|
|
| 20 |
20 |
City's share of a $1,700,000
County project to rehabilitate 2 St SW (CR 34) from 18 Av, west to West
Circle Dr SW. |
|
500,000 |
|
|
500,000 |
ms |
|
| 20 |
|
|
|
|
|
|
|
| 21 |
21 |
Reconstruct 1st Av SW from 4th
St to Soldiers Field and replace sanitary sewer trunkline from 4 St SW to the
Zumbro River via 1 Av SW. Revenue
bonds repaid by sewer utility user rates. |
2170 |
3,200,000 |
|
250,000 |
t |
250,000 |
t |
500,000 |
t |
|
| 21 |
|
|
|
|
|
1,000,000 |
a |
|
| 21 |
|
|
|
|
|
454,000 |
rb |
|
| 21 |
|
|
|
|
|
300,000 |
wu |
|
| 21 |
|
|
|
|
|
446,000 |
r |
|
| 21 |
|
|
|
|
|
| 22 |
22 |
Construct Badger Hills Drive NW
(41st Street) from West Circle Drive to 50th Ave NW. Phase 1 is 1000 ft east of CSAH 22 to 2500
ft west. Phase 2 is from phase 1
terminus west to 50th Ave. TID fees to
be transferred from the Westside TID. |
7727 |
2,500,000 |
|
500,000 |
ms |
|
500,000 |
ms |
|
| 22 |
|
|
|
|
|
1,000,000 |
td |
|
500,000 |
td |
|
| 22 |
|
|
|
|
|
|
|
| 23 |
23 |
Reconstruct 65 St NW from 34 Av
to 60th Av NW. Phase 1 from 34th Av
to 50th Avenue NW (to be completed in 2010).
TID fees to be transferred from the 65th Street TID. |
9852 |
4,200,000 |
|
550,000 |
ms |
|
500,000 |
ms |
| 23 |
|
Reconstruct 65 St NW from 34 Av
to 60th Av NW. Phase 2 from 50th Ave
to 60th Av NW (to be completed in 2013).
TID fees to be transferred from the 65th Street TID. |
9853 |
|
|
1,650,000 |
td |
|
1,500,000 |
td |
| 23 |
|
|
|
|
|
| 23 |
|
|
|
|
|
| 23 |
|
|
|
|
|
| 23 |
|
|
|
|
|
| 24 |
24 |
Reconstruct 20 St SW from TH63
to Mayowood Rd (CR125). |
9859 |
2,250,000 |
|
250,000 |
ms |
1,000,000 |
f |
|
| 24 |
|
|
|
|
|
|
|
450,000 |
a |
|
| 24 |
|
|
|
|
|
| 24 |
|
|
|
|
|
550,000 |
ms |
|
| 24 |
|
|
|
|
|
| 25 |
25 |
Reconstruct Pinewood Rd SE from
CR #1 to 30th Av, and 30th Av SE from Pinewood Rd to CR #36. |
7257 |
1,850,000 |
|
100,000 |
ms |
1,000,000 |
f |
|
| 25 |
|
|
|
|
|
250,000 |
a |
|
| 25 |
|
|
|
|
|
|
|
500,000 |
ms |
|
| 25 |
|
|
|
|
|
| 26 |
26 |
Improvements to city entrance at
TH 14 East. |
|
500,000 |
|
250,000 |
p |
|
| 26 |
|
|
|
|
|
250,000 |
st |
|
| 26 |
|
|
|
|
|
| 27 |
27 |
Mill and Overlay TH14 from TH52
to CSAH 36. City Share of a State
(MnDOT) project. |
7241 |
3,000,000 |
|
1,000,000 |
f |
|
|
|
| 27 |
|
|
|
|
|
2,000,000 |
st |
|
|
|
| 27 |
|
|
|
|
|
| 28 |
28 |
Reconstruct 7th St NW from W.
Circle Dr to Lake St NW (inlcudes storm sewer upsizing) |
|
350,000 |
|
250,000 |
t |
|
| 28 |
|
|
|
|
|
100,000 |
p |
|
| 28 |
|
|
|
|
|
| 29 |
29 |
Concrete Pavement Rehabilitation
11th Av NE from 7th St to 14th St NE. |
|
400,000 |
|
400,000 |
ms |
|
| 29 |
|
|
|
|
|
| 30 |
30 |
Widen 19 St NW: Phase 2 is from Ashland Dr to west of 50th
Ave (to be completed in 2011). TID
fees to be transferred from the Westside TID. |
9707 |
3,139,000 |
|
194,750 |
ms |
|
1,100,000 |
ms |
| 30 |
|
Widen 19 St NW: Phase 3 is from 50th Ave to 60th Ave NW (to
be completed in 2013). TID fees to be
transferred from the Westside TID. |
9857 |
|
|
744,250 |
td |
|
1,100,000 |
td |
| 30 |
|
|
|
|
|
| 30 |
|
|
|
|
|
|
|
| 31 |
31 |
Reconstruct 50 Av NW: Phase 3 is from Valleyhigh Dr to south of
19 St NW (to be completed in 2011).
TID fees to be transferred from the Westside TID. |
9720 |
2,300,000 |
|
250,000 |
ms |
|
325,000 |
ms |
| 31 |
|
Reconstruct 50 Av NW: Phase 4 is from 19th St, south across TH14
(to be completed in 2013). TID fees to
be transferred from the Westside TID. |
|
|
|
750,000 |
td |
|
975,000 |
td |
| 31 |
|
|
|
|
|
| 32 |
32 |
Construct 55 St NW, Phase 3,
from 60 Av to CR #3. TID fees to be
transferred from the Westside TID. |
|
2,000,000 |
|
250,000 |
ms |
250,000 |
ms |
|
| 32 |
|
|
|
|
|
750,000 |
td |
750,000 |
td |
|
| 32 |
|
|
|
|
|
| 33 |
33 |
Widen 50 Av NW - Phase 2 from
Nicklaus Dr NW to Valleyhigh Dr NW.
TID fees to be transferred from the Westside TID. |
9719 |
6,360,000 |
|
1,350,000 |
f |
|
| 33 |
|
|
|
|
|
4,875,000 |
td |
|
| 33 |
|
|
|
|
|
60,000 |
wu |
|
| 33 |
|
|
|
|
|
75,000 |
sa |
|
| 33 |
|
|
|
|
|
| 34 |
34 |
Construct 65th St / TH 52
Interchange. TID fees to be
transferred from the 65th Street TID. |
7212 |
5,000,000 |
|
3,750,000 |
td |
|
| 34 |
|
|
|
|
|
1,250,000 |
st |
|
| 34 |
|
|
|
|
|
|
|
|
| 35 |
35 |
Construct north approach to CSAH
8 and CSAH 22 intersection. |
9771 |
200,000 |
|
|
|
|
|
200,000 |
a |
|
| 35 |
|
|
|
|
|
| 36 |
36 |
Reconstruct / realign 11th Ave
SW from 60th St to CR #16. TID fees to
be transferred from the 48th Street TID. |
7203 |
2,900,000 |
|
725,000 |
ms |
|
| 36 |
|
|
|
|
|
2,175,000 |
td |
|
| 36 |
|
|
|
|
|
|
|
|
| 37 |
37 |
Reconstruct and widen East River
Rd from 37 St, north to Hadley Creek.
TID fees to be transferred from the East River Road TID. |
|
800,000 |
|
200,000 |
ms |
|
| 37 |
|
|
|
|
|
600,000 |
td |
|
| 37 |
|
|
|
|
|
| 37 |
|
|
|
|
|
| 38 |
38 |
City's share of a $3,000,000
County project to reconstruct County Rd #112 (18th Ave NW) from 41 St NW to
just south of 55th St NW. |
9855 |
500,000 |
|
500,000 |
ms |
|
| 38 |
|
|
|
|
|
| 38 |
|
|
|
|
|
| 38 |
|
|
|
|
|
| 39 |
39 |
Widen Villa Road NW from Chateau
Rd to North Park subdivision (includes pedestrian facilities). |
|
500,000 |
|
400,000 |
ms |
|
| 39 |
|
|
|
|
|
100,000 |
a |
|
| 39 |
|
|
|
|
|
| 40 |
40 |
TH63 South E. Frontage Rd
improvments from Tyrol First Addtn. to 60th St SE. |
|
500,000 |
|
250,000 |
a |
|
| 40 |
|
|
|
|
|
250,000 |
ms |
|
| 40 |
|
|
|
|
|
| 41 |
41 |
Reconstruct Eastwood Rd from
Marion Rd (CSAH 36) to Hillcrest Ct SE.
TID fees to be transferred from the SE TID. |
|
1,000,000 |
|
1,000,000 |
td |
|
| 41 |
|
|
|
|
|
| 42 |
42 |
Construct SE Frontage Rd from CR
1, east to Stacey St SE. TID fees to
be transferred from the SE TID. |
|
1,000,000 |
|
500,000 |
td |
|
| 42 |
|
|
|
|
|
500,000 |
p |
|
| 42 |
|
|
|
|
|
| 43 |
43 |
Replace 4th Street SE Bridge
(bridge no. 55557) |
|
2,000,000 |
|
500,000 |
f |
|
| 43 |
|
|
|
|
|
1,500,000 |
ms |
|
| 43 |
|
|
|
|
|
| 44 |
44 |
Reconstruct and construct 40 Av
SE from TH14 to 20 St SE. TID fees to
be transferred from the SE TID. |
7211 |
2,000,000 |
|
500,000 |
ms |
| 44 |
|
|
|
|
|
1,500,000 |
td |
| 44 |
|
|
|
|
|
|
|
|
| 45 |
45 |
Construct 32nd St SE from H63 to
11th Av SE (CSAH 1). |
|
2,000,000 |
|
2,000,000 |
td |
| 45 |
|
|
|
|
|
| 46 |
46 |
Replace 6th Street SE Bridge
(bridge no. 55509) |
|
2,000,000 |
|
500,000 |
f |
| 46 |
|
|
|
|
|
1,500,000 |
ms |
| 46 |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Cost |
|
107,613,168 |
10,025,000 |
|
19,290,000 |
|
15,200,000 |
|
27,499,000 |
|
14,849,168 |
|
20,750,000 |
|
|
|
Sources of Funds |
|
|
|
|
Special Assessment Bonds |
a |
17,650,000 |
2,900,000 |
a |
2,750,000 |
a |
2,950,000 |
a |
3,100,000 |
a |
3,650,000 |
a |
2,300,000 |
a |
|
|
Abatement District |
ad |
- |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
|
|
County |
c |
- |
- |
c |
- |
c |
- |
c |
- |
c |
- |
c |
- |
c |
|
|
Electric Utility |
eu |
- |
|