Major Streets                                 2008-2013                        Capital Improvements Program       Schedule for Six Year Period
    a = Special assessment Bonds                 ad = Abatement District                            c = County        eu = Electric Utility                                     f = Federal                                                           fr = Flood Control Reserves  
    fb = Food & Beverage Tax                            go = General Obligation Bonds              gs = Golf Surplus Park & Rec Fund      lt = Lodging Tax                                        ms = MN State Aid-Streets                               ot = Operating Transfer-General Fund  
    p = Private Funds                                           pc = Passenger Facility Charges            r = Project Reserves       rb = GO Revenue Bonds                        re = Retained Earnings                                    s = State  
    sa = Sn/Sewer Availability Chg                    sl = State Loan Fund                                st = Sales Tax         sw = Storm Water Mgmt Chg                  t = Tax Levy                                                        td = Traffic Improvement Dist Chg  
    ti = Tax Increments                                         to = Operating Trnsfrs-Other Fnds        wa = Water Availability Chg       wu = Water Utility  
Sort Map # Project Description Proj # Total Cost 2008 2009 2010 2011 2012 2013
0
1 1 Rehabilitation of bituminous streets with a pavement condition index of 0-59. 2200          14,200,000          1,000,000  r           1,100,000  r              600,000  t              600,000  t              650,000  t              650,000  t 
           1,000,000  a           1,100,000  a              600,000  r              600,000  r              650,000  r              650,000  r 
1              1,200,000  a           1,200,000  a           1,300,000  a           1,300,000  a 
1    
2 2 Street resurfacing/preservation of streets with pavement condition index of 60-100. 2201          12,000,000          1,000,000  r           1,000,000  r           1,000,000  r           1,000,000  r           1,000,000  r           1,000,000  r 
2              1,000,000  a           1,000,000  a           1,000,000  a           1,000,000  a           1,000,000  a           1,000,000  a 
2  
3 3 Bridge repairs and painting by contract at various locations 7901                550,000             100,000  r              150,000  r                      150,000  t              150,000  t 
3    
4 4 Reimbursement fund for TH 52 sales tax funds used to finance 50th Av NW project/Phase 1. 9883            1,049,168             250,000  t              250,000  t              250,000  t              250,000  t                49,168  t 
4    
5 5 City's share of a $2,200,000 County project to reconstruct CSAH 22/25 from CSAH #8 to TH14/TH52. 7255                250,000               25,000  ms              225,000  ms 
5    
5  
6 6 Construct 20 St SE from CR #1 to CR #36.   Sales Tax project. (includes drainageway improvements from CR36 to Bear Cr).  ROW costs included.  2208            7,140,000             450,000  st           2,420,000  f         
6              4,270,000  st         
6    
7 7 Reconstruct 11 Av NW from 6th Street to 10th St NW and Rehabilition of 11th Ave from 10th St NW to 14th St NW. 7746            2,500,000             730,000  f 
7                 150,000  a 
7                   16,000  wu 
7              1,604,000  ms 
7  
8 8 Reconstruction of Center Street from 1st Av West to Zumbro Bridge. 7742            2,000,000             750,000  f 
8                 750,000  a 
8                 500,000  ms 
8    
9 9 Correct geometric deficiencies on 28 St SW (Bamberwood Area).  7263                500,000             400,000  p         
9                 100,000  t         
9    
10 10 Widening of CSAH #2 (Viola Rd NE) from Century Hills Dr to 36 Avenue NE 7244                200,000             200,000  ms 
10    
11 11 City's share of a $1,400,000 County project to widen Valleyhigh Dr (CR #4) from 31st Ave to 50th Ave NW.  Funding due from the Celestica TIF District #16. 9858                500,000             500,000  ti 
11            
12 12 Concrete pavement rehabilitation on State Aid Routes            1,500,000                     500,000  ms                      500,000  ms              500,000  ms 
12    
13 13 Multi-phased improvements to:  55 St NW at West Circle Dr; 55th St at Fairway Drive NW; and Members Parkway.   9856            6,925,000          2,925,000  ms                   4,000,000  ms 
13    
14 14 Reconstruct 2 St SW from 2 Av SW to 6 Av SW with concrete pavement. 7214            2,100,000             100,000  ms              750,000  f 
14                 750,000  a 
14                 500,000  ms 
14  
15 15 TH14 East Access Management Improvements near 40th Avenue SE 7249                250,000             250,000  t 
15            
15  
16 16 Rehabilitate West River Parkway from Elton Hills Drive to 37 St NW. 7208                700,000             340,000  f 
16                 360,000  ms 
16    
17 17 Rehabilitate 25th St SW from Broadway to Oakridge Dr SW.  7750                500,000             250,000  ms 
17                 250,000  a 
17  
18 18 Reconstruct 6th Street SW from Broadway to 4th Avenue SW. 7732            1,500,000             350,000  t 
18                 350,000  a 
18                 800,000  ms 
18    
19 19 Improve TH 52 East Frontage Rd north of 41 St and the intersection at TH52 East Frontage Rd and 41 St NW. 9563                300,000             250,000  ms 
19                   50,000  a 
19    
20 20 City's share of a $1,700,000 County project to rehabilitate 2 St SW (CR 34) from 18 Av, west to West Circle Dr SW.                500,000                     500,000  ms 
20            
21 21 Reconstruct 1st Av SW from 4th St to Soldiers Field and replace sanitary sewer trunkline from 4 St SW to the Zumbro River via 1 Av SW.   Revenue bonds repaid by sewer utility user rates. 2170            3,200,000             250,000  t              250,000  t              500,000  t 
21            1,000,000  a 
21               454,000  rb 
21                 300,000  wu 
21                 446,000  r 
21  
22 22 Construct Badger Hills Drive NW (41st Street) from West Circle Drive to 50th Ave NW.  Phase 1 is 1000 ft east of CSAH 22 to 2500 ft west.  Phase 2 is from phase 1 terminus west to 50th Ave.  TID fees to be transferred from the Westside TID. 7727            2,500,000             500,000  ms              500,000  ms 
22              1,000,000  td              500,000  td 
22            
23 23 Reconstruct 65 St NW from 34 Av to 60th Av NW.   Phase 1 from 34th Av to 50th Avenue NW (to be completed in 2010).  TID fees to be transferred from the 65th Street TID. 9852            4,200,000             550,000  ms              500,000  ms 
23 Reconstruct 65 St NW from 34 Av to 60th Av NW.   Phase 2 from 50th Ave to 60th Av NW (to be completed in 2013).  TID fees to be transferred from the 65th Street TID. 9853              1,650,000  td           1,500,000  td 
23  
23  
23  
23    
24 24 Reconstruct 20 St SW from TH63 to Mayowood Rd (CR125).  9859            2,250,000             250,000  ms           1,000,000  f 
24                         450,000  a 
24  
24                 550,000  ms 
24  
25 25 Reconstruct Pinewood Rd SE from CR #1 to 30th Av, and 30th Av SE from Pinewood Rd to CR #36.  7257            1,850,000             100,000  ms           1,000,000  f 
25                 250,000  a 
25                         500,000  ms 
25  
26 26 Improvements to city entrance at TH 14 East.                500,000             250,000  p 
26                 250,000  st 
26  
27 27 Mill and Overlay TH14 from TH52 to CSAH 36.  City Share of a State (MnDOT) project. 7241            3,000,000          1,000,000  f         
27              2,000,000  st         
27    
28 28 Reconstruct 7th St NW from W. Circle Dr to Lake St NW (inlcudes storm sewer upsizing)                350,000             250,000  t 
28                   100,000  p 
28    
29 29 Concrete Pavement Rehabilitation 11th Av NE from 7th St to 14th St NE.                400,000             400,000  ms 
29    
30 30 Widen 19 St NW:  Phase 2 is from Ashland Dr to west of 50th Ave (to be completed in 2011).  TID fees to be transferred from the Westside TID. 9707            3,139,000             194,750  ms           1,100,000  ms 
30 Widen 19 St NW:  Phase 3 is from 50th Ave to 60th Ave NW (to be completed in 2013).  TID fees to be transferred from the Westside TID. 9857                 744,250  td           1,100,000  td 
30  
30            
31 31 Reconstruct 50 Av NW:  Phase 3 is from Valleyhigh Dr to south of 19 St NW (to be completed in 2011).  TID fees to be transferred from the Westside TID. 9720            2,300,000             250,000  ms              325,000  ms 
31 Reconstruct 50 Av NW:  Phase 4 is from 19th St, south across TH14 (to be completed in 2013).  TID fees to be transferred from the Westside TID.                 750,000  td              975,000  td 
31    
32 32 Construct 55 St NW, Phase 3, from 60 Av to CR #3.  TID fees to be transferred from the Westside TID.            2,000,000             250,000  ms              250,000  ms 
32                 750,000  td              750,000  td 
32    
33 33 Widen 50 Av NW - Phase 2 from Nicklaus Dr NW to Valleyhigh Dr NW.  TID fees to be transferred from the Westside TID. 9719            6,360,000          1,350,000  f 
33                    4,875,000  td 
33                   60,000  wu 
33                   75,000  sa 
33    
34 34 Construct 65th St / TH 52 Interchange.  TID fees to be transferred from the 65th Street TID. 7212            5,000,000          3,750,000  td 
34              1,250,000  st 
34            
35 35 Construct north approach to CSAH 8 and CSAH 22 intersection. 9771                200,000                             200,000  a 
35    
36 36 Reconstruct / realign 11th Ave SW from 60th St to CR #16.  TID fees to be transferred from the 48th Street TID. 7203            2,900,000             725,000  ms 
36              2,175,000  td 
36            
37 37 Reconstruct and widen East River Rd from 37 St, north to Hadley Creek.  TID fees to be transferred from the East River Road TID.                800,000             200,000  ms 
37                 600,000  td 
37  
37    
38 38 City's share of a $3,000,000 County project to reconstruct County Rd #112 (18th Ave NW) from 41 St NW to just south of 55th St NW. 9855                500,000             500,000  ms 
38  
38  
38  
39 39 Widen Villa Road NW from Chateau Rd to North Park subdivision (includes pedestrian facilities).                500,000             400,000  ms 
39                 100,000  a 
39    
40 40 TH63 South E. Frontage Rd improvments from Tyrol First Addtn. to 60th St SE.                 500,000             250,000  a 
40                 250,000  ms 
40    
41 41 Reconstruct Eastwood Rd from Marion Rd (CSAH 36) to Hillcrest Ct SE.  TID fees to be transferred from the SE TID.            1,000,000          1,000,000  td 
41    
42 42 Construct SE Frontage Rd from CR 1, east to Stacey St SE.  TID fees to be transferred from the SE TID.            1,000,000             500,000  td 
42                 500,000  p 
42    
43 43 Replace 4th Street SE Bridge (bridge no. 55557)            2,000,000             500,000  f 
43              1,500,000  ms 
43    
44 44 Reconstruct and construct 40 Av SE from TH14 to 20 St SE.  TID fees to be transferred from the SE TID. 7211            2,000,000             500,000  ms 
44              1,500,000  td 
44            
45 45 Construct 32nd St SE from H63 to 11th Av SE (CSAH 1).              2,000,000          2,000,000  td 
45    
46 46 Replace 6th Street SE Bridge (bridge no. 55509)            2,000,000             500,000  f 
46              1,500,000  ms 
46    
                                 
Total Cost          107,613,168       10,025,000         19,290,000         15,200,000         27,499,000         14,849,168         20,750,000  
Sources of Funds
Special Assessment Bonds a          17,650,000          2,900,000 a          2,750,000 a          2,950,000 a          3,100,000 a          3,650,000 a          2,300,000 a
County c                           -                           -   c                         -   c                         -   c                         -   c                         -   c                         -   c