| Traffic
2008-2013
Capital Improvements Program |
Schedule for Six
Year Period |
|
|
|
|
|
|
|
|
|
| |
|
a = Special assessment
Bonds ad = Abatement
District c =
County |
|
eu = Electric Utility f =
Federal
fr = Flood Control Reserves |
|
| |
|
fb = Food & Beverage
Tax go =
General Obligation Bonds
gs = Golf Surplus Park & Rec Fund |
lt = Lodging Tax ms =
MN State Aid-Streets ot = Operating
Transfer-General Fund |
|
| |
|
p = Private Funds pc
= Passenger Facility Charges
r = Project Reserves |
rb = GO Revenue Bonds re = Retained
Earnings
s = State |
|
| |
|
sa = Sn/Sewer
Availability Chg sl
= State Loan Fund st = Sales
Tax |
|
sw = Storm Water Mgmt Chg t = Tax Levy
td = Traffic Improvement Dist Chg |
|
| |
|
ti = Tax Increments to =
Operating Trnsfrs-Other Fnds wa
= Water Availability Chg |
wu = Water Utility |
|
|
|
|
|
|
|
| Sort |
Map # |
Project Description |
Proj # |
Total Cost |
2008 |
|
2009 |
|
2010 |
|
2011 |
|
2012 |
|
2013 |
|
| 0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
1 |
Traffic signal controller
replacement program. Replacement of
three controllers and one cabinet per year. |
6308 |
460,000 |
85,000 |
r |
75,000 |
t |
75,000 |
t |
75,000 |
t |
75,000 |
t |
75,000 |
t |
|
| 1 |
|
|
|
|
|
|
|
|
|
| 2 |
2 |
Durable pavement markings on
city streets. Includes 6.5 miles / yr
of epoxy paint, 0.5 miles of polypreform tape, and 300 permanent pavment
markings / yr. |
6374 |
650,000 |
100,000 |
t |
100,000 |
t |
105,000 |
t |
110,000 |
t |
115,000 |
t |
120,000 |
t |
|
| 2 |
|
|
|
|
|
|
|
|
|
| 3 |
3 |
Traffic signal painting
program. The program includes 12
signals per year. |
6399 |
475,000 |
30,000 |
t |
75,000 |
t |
75,000 |
t |
75,000 |
t |
75,000 |
t |
75,000 |
t |
|
| 3 |
|
|
|
|
70,000 |
r |
|
|
|
|
|
| 3 |
|
|
|
|
|
|
|
|
|
| 4 |
4 |
Signal Optimization (signal
timing review and adjustments on a 4 yr rotation). |
6017 |
600,000 |
100,000 |
t |
100,000 |
t |
100,000 |
t |
100,000 |
t |
100,000 |
t |
100,000 |
t |
|
| 4 |
|
|
|
|
|
|
|
|
|
| 5 |
5 |
Replace signage (10,000 signs in
inventory; replace 800 - 1000 signs/ yr) |
6030 |
325,000 |
25,000 |
t |
35,000 |
t |
50,000 |
t |
50,000 |
t |
75,000 |
t |
90,000 |
t |
|
| 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6 |
6 |
Traffic calming program in
residential neighborhoods. |
8208 |
500,000 |
50,000 |
r |
50,000 |
t |
50,000 |
t |
50,000 |
t |
50,000 |
t |
|
|
|
| 6 |
|
|
|
|
50,000 |
a |
50,000 |
a |
50,000 |
a |
50,000 |
a |
50,000 |
a |
|
|
|
| 6 |
|
|
|
|
|
|
|
|
|
| 7 |
7 |
Implement Broadway Study
intersection signal system and geometric improvements. |
6006 |
1,000,000 |
100,000 |
ms |
100,000 |
ms |
100,000 |
ms |
100,000 |
ms |
100,000 |
ms |
|
|
|
| 7 |
|
|
|
|
100,000 |
s |
100,000 |
s |
100,000 |
s |
100,000 |
s |
100,000 |
s |
|
|
|
| 7 |
|
|
|
|
|
|
|
|
|
| 8 |
8 |
Install traffic signals at Maine
Street development. TID fees to be
transferred from the Willow Creek TID. |
6005 |
1,150,000 |
150,000 |
r |
|
375,000 |
td |
|
300,000 |
td |
|
|
|
| 8 |
|
|
|
|
|
|
125,000 |
ms |
|
100,000 |
ms |
|
|
|
| 8 |
|
|
|
|
|
|
100,000 |
c |
|
|
|
|
|
| 8 |
|
|
|
|
|
|
|
|
|
| 9 |
9 |
Upgrade Iteris Cameras to newest
technology (15 cards for each of two years - older black and white cameras
with lower detection ability) |
6031 |
60,000 |
30,000 |
t |
30,000 |
t |
|
|
|
|
|
| 9 |
|
|
|
|
|
|
|
|
|
| 10 |
10 |
Install a traffic signal at East
Circle Dr and Northern Valley Dr NE. Project includes construction of
Northern Valley Place NE. |
6003 |
300,000 |
100,000 |
c |
|
|
|
|
|
| 10 |
|
|
|
|
175,000 |
ms |
|
|
|
|
|
| 10 |
|
|
|
|
25,000 |
p |
|
|
|
|
|
| 10 |
|
|
|
|
|
|
|
|
|
| 11 |
11 |
Install traffic / pedestrian
signal at TH63 and 3rd Street South. |
6021 |
250,000 |
75,000 |
t |
|
|
|
|
|
| 11 |
|
|
|
|
175,000 |
ms |
|
|
|
|
|
| 11 |
|
|
|
|
|
|
|
|
|
| 12 |
12 |
Install a traffic signal at CSAH
2 (Viola Rd NE) and Century Hills Dr/Cassidy Dr NE. |
6013 |
200,000 |
100,000 |
ms |
|
|
|
|
|
| 12 |
|
|
|
|
100,000 |
c |
|
|
|
|
|
| 12 |
|
|
|
|
|
|
|
|
|
| 13 |
13 |
Install a traffic signal at the
intersection of 41 St and 31 Ave NW. |
6329 |
200,000 |
155,000 |
ms |
|
|
|
|
|
|
| 13 |
|
|
|
|
45,000 |
p |
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|
|
|
|
| 14 |
14 |
Install a traffic signal at the
intersection of 3rd Av and 16 St SE.
Transfer $150,000 from J1994 (Future Construction). |
6029 |
300,000 |
150,000 |
c |
|
|
|
|
|
|
| 14 |
|
|
|
|
150,000 |
r |
|
|
|
|
|
|
| 14 |
|
|
|
|
|
|
|
|
|
| 15 |
15 |
Install a traffic signal at
Rocky Creek Dr and East Circle Dr NE. |
6010 |
300,000 |
|
100,000 |
c |
|
|
|
|
|
| 15 |
|
|
|
|
|
150,000 |
ms |
|
|
|
|
|
| 15 |
|
|
|
|
|
50,000 |
td |
|
|
|
|
|
| 15 |
|
|
|
|
|
|
|
|
|
| 16 |
16 |
Public Awareness Campaign for
Pedestrian safety and to reduce speeding (a request for support from the
County and TZD group will be made for the additional funding). |
|
195,000 |
|
65,000 |
t |
|
|
|
|
|
| 16 |
|
|
|
|
|
|
65,000 |
c |
|
|
|
|
|
|
|
|
|
| 16 |
|
|
|
|
|
65,000 |
p |
|
|
|
|
|
| 16 |
|
|
|
|
|
|
|
|
|
| 17 |
17 |
Install a traffic signal at CSAH
22 and Members Parkway NW and remove signal at CSAH 22 & 55th St NW. |
6007 |
300,000 |
|
215,000 |
ms |
|
|
|
|
|
| 17 |
|
|
|
|
|
85,000 |
c |
|
|
|
|
|
| 17 |
|
|
|
|
|
|
|
|
|
| 18 |
18 |
Install a traffic signal at TH
63 North and 48th Street NE. |
|
200,000 |
|
100,000 |
c |
|
|
|
|
|
| 18 |
|
|
|
|
|
100,000 |
s |
|
|
|
|
|
| 18 |
|
|
|
|
|
|
|
|
|
|
|
| 19 |
19 |
Install a traffic signal at 16
St and Maywood Road SW. |
6009 |
200,000 |
|
200,000 |
c |
|
|
|
|
|
| 19 |
|
|
|
|
|
|
|
|
|
| 20 |
20 |
Install a traffic signal at the
intersection of 11 Ave and 20 St SE. |
6320 |
200,000 |
|
|
100,000 |
c |
|
|
|
|
|
| 20 |
|
|
|
|
|
100,000 |
st |
|
|
|
|
|
| 20 |
|
|
|
|
|
|
|
|
|
| 21 |
21 |
Install a traffic signal at the
intersection of West Circle Drive and 3rd St NW. |
|
200,000 |
|
100,000 |
ms |
|
|
|
|
|
| 21 |
|
|
|
|
|
100,000 |
c |
|
|
|
|
|
| 21 |
|
|
|
|
|
|
|
|
|
| 22 |
22 |
Install a traffic signal at the
intersection of West Circle Drive and 26th St NW. |
|
200,000 |
|
100,000 |
ms |
|
|
|
|
|
| 22 |
|
|
|
|
|
100,000 |
c |
|
|
|
|
|
| 22 |
|
|
|
|
|
|
|
|
|
| 23 |
23 |
Install a traffic signal at TH63
west ramps and 48 St SW. |
6024 |
200,000 |
|
100,000 |
ms |
|
|
|
|
|
| 23 |
|
|
|
|
|
100,000 |
s |
|
|
|
|
|
| 23 |
|
|
|
|
|
|
|
|
|
| 24 |
24 |
Replace and interconnect traffic
signals on TH 14 from 3rd Avenue SE to Marion Rd SE. |
6339 |
900,000 |
|
450,000 |
s |
|
|
|
|
|
| 24 |
|
|
|
|
|
281,250 |
f |
|
|
|
|
|
| 24 |
|
|
|
|
|
168,750 |
c |
|
|
|
|
|
| 24 |
|
|
|
|
|
|
|
|
|
| 25 |
25 |
Install a traffic signal at the
intersection of 55 St and 44 Ave NW. |
|
250,000 |
|
|
250,000 |
ms |
|
|
|
|
|
| 25 |
|
|
|
|
|
|
|
|
|
| 26 |
26 |
Install a traffic signal at
Valleyhigh Drive and 50th Avenue NW.
TID fees transferred from J7229 (Westside TID). |
|
200,000 |
|
|
100,000 |
td |
|
|
|
|
|
| 26 |
|
|
|
|
|
|
100,000 |
c |
|
|
|
|
|
| 26 |
|
|
|
|
|
|
|
|
|
| 27 |
27 |
Install Fiber Optic network to
replace the twisted pair for signal interconnect (coordinate with IS for city
wide system). |
|
400,000 |
|
400,000 |
ms |
|
|
|
|
|
| 27 |
|
|
|
|
|
|
|
|
|
|
|
|
| 28 |
28 |
Install a traffic signal at TH14
and 40th Avenue SE along with TH14 Access Management Plan Improvements. TID fees transferred from J7217 (SE TID). |
|
300,000 |
|
|
37,500 |
ms |
|
|
|
|
|
| 28 |
|
|
|
|
|
|
150,000 |
s |
|
|
|
|
|
| 28 |
|
|
|
|
|
|
112,500 |
td |
|
|
|
|
|
| 28 |
|
|
|
|
|
|
|
|
|
|
|
| 28 |
|
|
|
|
|
|
|
|
|
|
|
| 28 |
|
|
|
|
|
|
|
|
|
|
|
| 28 |
|
|
|
|
|
|
|
|
|
| 29 |
29 |
Install a traffic signal at 2nd
St SW and 23rd Ave SW. Reserves transferred from J9769. |
6318 |
200,000 |
|
100,000 |
c |
|
|
|
|
|
| 29 |
|
|
|
|
|
60,000 |
ms |
|
|
|
|
|
| 29 |
|
|
|
|
|
20,000 |
p |
|
|
|
|
|
| 29 |
|
|
|
|
|
20,000 |
r |
|
|
|
|
|
|
|
|
| 29 |
|
|
|
|
|
|
|
|
|
| 30 |
30 |
Install a traffic signal at the
intersection of 55 St and 50 Ave NW. |
|
200,000 |
|
|
|
200,000 |
ms |
|
|
|
|
|
| 30 |
|
|
|
|
|
|
|
|
|
| 31 |
31 |
Marion Road and Eastwood Road
intersection improvements. TID fees
transferred from J7217 (SE TID). |
|
200,000 |
|
12,500 |
ms |
|
|
|
| 31 |
|
|
|
|
|
150,000 |
c |
|
|
|
| 31 |
|
|
|
|
|
37,500 |
td |
|
|
|
| 31 |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Cost |
|
11,115,000 |
2,140,000 |
|
2,510,000 |
|
3,255,000 |
|
1,410,000 |
|
1,340,000 |
|
460,000 |
|
|
|
|
Sources of Funds |
|
|
|
|
Special Assessment Bonds |
a |
250,000 |
50,000 |
a |
50,000 |
a |
50,000 |
a |
50,000 |
a |
50,000 |
a |
- |
a |
|
|
|
Abatement District |
ad |
- |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
- |
ad |
|
|
|
County |
c |
1,818,750 |
350,000 |
c |
850,000 |
c |
368,750 |
c |
100,000 |
c |
150,000 |
c |
- |
c |
|
|
|
Electric Utility |
eu |
- |
- |
eu |
- |
eu |
- |
eu |
- |
eu |
- |
eu |
- |
eu |
|
|
|
Federal |
f |
281,250 |
- |
f |
- |
f |
281,250 |
f |
- |
f |
- |
f |
- |
f |
|
|
|
Flood Control Reserves |
fr |
- |
- |
fr |
- |
fr |
- |
fr |
- |
fr |
- |
fr |
- |
fr |
|
|
|
General Obligation Bonds |
go |
- |
- |
go |
- |
go |
- |
go |
- |
go |
- |
go |
- |
go |
|
|
|
Golf Surplus Park & Rec Fund |
gs |
- |
- |
gs |
- |
gs |
- |
gs |
- |
gs |
- |
gs |
- |
gs |
|
|
|
Municipal State Aid for Streets |
ms |
2,955,000 |
705,000 |
ms |
665,000 |
ms |
975,000 |
ms |
397,500 |
ms |
212,500 |
ms |
- |
ms |
|
|
|
Operating Transfer - General Fund |
ot |
- |
- |
ot |
- |
ot |
- |
ot |
- |
ot |
- |
ot |
- |
ot |
|
|
|
Private Funds |
p |
155,000 |
70,000 |
p |
65,000 |
p |
- |
p |
20,000 |
p |
- |
p |
- |
p |
|
|
|
Passenger Facility Charges |
pc |
- |
- |
pc |
- |
pc |
- |
pc |
- |
pc |
- |
pc |
- |
pc |
|
|
|
Project reserves |
r |
525,000 |
505,000 |
r |
- |
r |
- |
r |
20,000 |
r |
- |
r |
- |
r |
|
|
|
General Obligation Revenue Bonds |
rb |
- |
- |
rb |
- |
rb |
- |
rb |
|