Parking                                     2008-2013                            Capital Improvements Program       Schedule for Six Year Period
    a = Special assessment Bonds                 ad = Abatement District                            c = County        eu = Electric Utility                                     f = Federal                                                           fr = Flood Control Reserves  
    fb = Food & Beverage Tax                            go = General Obligation Bonds              gs = Golf Surplus Park & Rec Fund      lt = Lodging Tax                                        ms = MN State Aid-Streets                               ot = Operating Transfer-General Fund
    p = Private Funds                                           pc = Passenger Facility Charges            r = Project Reserves       rb = GO Revenue Bonds                        re = Retained Earnings                                    s = State  
    sa = Sn/Sewer Availability Chg                    sl = State Loan Fund                                st = Sales Tax         sw = Storm Water Mgmt Chg                  t = Tax Levy                                                        td = Traffic Improvement Dist Chg  
    ti = Tax Increments                                         to = Operating Trnsfrs-Other Fnds        wa = Water Availability Chg       wu = Water Utility  
Sort Map # Project Description Proj # Total Cost 2008 2009 2010 2011 2012 2013
0
1 1 Restoration Second Street Ramp.  Waterproofing, structural, electrical and mechanical repairs, revisions to the HVAC system and upgrade the elevators. 2594                600,000             300,000  re              300,000  re 
1  
2 2 Electronic message signs for wayfind and parking availability. 2575                150,000             150,000  re 
2  
3 3 Revenue control changes at Third Street Ramp coordinated with expansion.  Involves a pay by space for metered spaces only and expand camera and communication system. 2583                150,000             150,000  re 
3  
4 4 Revenue control changes at Civic Center North lot.  Includes a pay by space non-gated system and includes expansion and improvements. 2588                  75,000               75,000  re 
4  
5 5 Center Street Ramp.  Restoration in 2009.  Add 1 deck (164 cars) ($2.5 mi) , with skyway connection ($1.2 m) to UMR in 2013.  Restoration again in 2013.   Revenue bonds to be repaid with future Parking Fund retained earnings. 2592            4,300,000             300,000  re           3,700,000  rb 
5               300,000  re 
5  
6 6 Construct a Park-N-Ride to be located in northwest Rochester at TH52 & 75th St NW.  Design and construct flat lot in 2009, and future ramp in 2013. 2573            5,480,000               96,000  re           1,000,000  re 
6               384,000  f           4,000,000  f 
6  
7 7 Construct new ramp (600 spaces) on east side of downtown.            9,000,000              9,000,000  re 
7  
8 8 Restoration Civic Center Ramp in 2010.  Waterproofing, structural, electrical, mechanical repairs as needed.  2578                200,000             200,000  re 
8  
9 9 Restoration Third Street Ramp in 2010.  Waterproofing, structural, electrical, mechanical repairs as needed. 2583                200,000             200,000  re 
9  
10 10 Restoration First Street Ramp in 2011.  Waterproofing, structural, electrical and mechanical repairs and revisions to the HVAC system. 2580                200,000                 200,000  re 
10  
                                 
Total Cost            20,355,000             675,000               780,000            9,400,000               200,000               300,000            9,000,000  
Sources of Funds
Federal f            4,384,000                         -   f             384,000 f                         -   f                         -   f                         -   f          4,000,000 f
General Obligation Revenue Bonds rb            3,700,000                         -   rb                         -   rb                         -   rb                         -   rb                         -   rb          3,700,000 rb
Retained Earnings re          12,271,000             675,000 re             396,000 re          9,400,000 re             200,000 re             300,000 re          1,300,000 re
Total Sources of Funds            20,355,000             675,000               780,000            9,400,000               200,000               300,000            9,000,000  
                   -