Overlay Paving

Bituminous Overlay Program

Print
Press Enter to show all options, press Tab go to next option

The City of Rochester’s street maintenance crews have been extending the life of the City streets with a partial depth mill and bituminous overlay process.  This process consists of milling approximately 2 inches of the existing pavement at the edge of the street, along the curb.  Following the edge milling, a 2 inch lift of bituminous pavement laid across the full with of the street. This street preservation process is done on an annual basis by City crews, with the assistance of a paving contractor.

Click to view neighborhood areas of the