Show/Hide

                                                                                    COVID-19 InformationInformation and Updates for Community Members

Transit News

Print
Press Enter to show all options, press Tab go to next option
 

Downtown transit center relocates as utility work closes 2 St SW

Post Date:04/16/2020 9:03 AM

Beginning April 20, utility work will require the closure of 2 St SW between Broadway Ave S and 1 Ave SW. As a result Rochester Public Transit (RPT) will be shifting the location of many of the downtown bus stops. All local routes (21-26) will stop on the west side (southbound lane) of 2 Ave SW. Direct routes will stay on 2 St SW. The 1D and 6D will stop on the north side (westbound lane) in front of Calvary Episcopal Church, and the 3D and 18D stopping on the south side (eastbound lane) of 2 St. SW. This work is expected to continue until fall.

Downtown station 0420
Return to full list >>