Master_Plan_logo-150

The City of Rochester Parks and Recreation Department has produced a comprehensive system plan. This year long process developed a plan for the future of Rochester’s park improvements, park development, and recreational programming for the next 20 years.  Click here for more information.

  

 

 

Silver Lake Projects & Dredging

Proposed Silver Lake Improvement Projects (2019)

The City of Rochester has identified improvements to Silver Lake Park that can be done during the necessary dredging of Silver Lake. The proposed projects are meant to increase pedestrian safety, provide needed park enhancements, improve environmental features, and provide alternative recreation opportunities. 

One potential enhancement is providing additional pedestrian improvements along North Broadway, via a pedestrian bridge to cross Silver Lake. This would also include extending a trail along the north side of Silver Lake. In addition, the existing dam is no longer needed and continues to require significant maintenance. An option to modify the dam is also being considered. All of these aspects are outlined in the Rochester Parks & Recreation System Plan, which was approved by the City in 2016.

March 27, 2019 Open House Materials:

Learn more about the Silver Lake Dredging project.

Feedback

Want to provide feedback on the proposed Silver Lake improvement projects?  Visit www.polco.us/Rochestermn.

Silver Lake Shoreline Buffer TMDL Project (2007)


Prairie Crossing Park

Prairie Crossing Park


Hundred Acre Wood Neighborhood Park

Construction Pictures (May 2020):

Hundred Acre Wood May AHundred Acre Wood May B


Morris Hills Neighborhood Park

Construction summer of 2020

Morris Hills Construction Drawing

2-5 Play Element

Eagles Perch

Health Ladder

T Swing


    Fieldstone Neighborhood Park

    Construction summer of 2020

    Fieldstone Concept 1

    Fieldstone Concept 2 Construction Drawing


    Cascade Lake

    Cascade-logo_125- Park Master Plan Executive Summary
    - Park Master Plan
    - Master Plan Concept (map only)
    - Beach Concept Plan (map only)
     

    May 2016 - Updated Master Plan 


    Indian Heights Park Master Plan


    Quarry Hill Master Plan

     Quarry Hill MP-image- Quarry Hill Master Plan

     

     

     


    Gamehaven Master Planning

    Gamehaven-Res_site_thGamehaven Park Master Plan

    - Guiding Principles
    - Site Map
    - Summer activities page
    - Winter activities page

     

     


    Mayo Park Master Planning

    MayoPark    - Master Plan 


     Central Park Master Planning

    Central Park-image_th - Preliminary Master Plan

     

     

     


    Soldiers Memorial Field Master Planning

    SF-thumbnail 
     
     

     

     

     

    Free viewers are required for some of the attached documents.
    They can be downloaded by clicking on the icons below.

    Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer